How to Use

Roof Rollers

Step‑by‑Step Guide for Safe & Efficient Roof Sheeting | Roll smarter. Roll safer. 

SHOP NOW ​​​​


Top 3 Value Propositions

1

Safety First Workflow

Every aspect of the guide – from risk assessment, exclusion zones to equipment checks – is designed to meet high‑risk roof work protocols as outlined by Safe Work Australia. 

2

Crane & Labour Efficiency 

By planning pack positions and using Roof Rollers to handle sheet packs efficiently, you reduce crane use, manual handling and labour time.

3

Built for Commercial-Scale Projects

Optimised for large warehouses and industrial roofs: truck‑plan, elevation plan, insulation integration, staging strategy - all included in one workflow.

Step-by-Step Process

How to Use Roof Rollers Australia


Pre-Planning in the Office

  • Prepare a Truck Plan showing truck & crane arrival/position.
  • Create an Elevation or Roof‑View Plan showing where packs will go.
  • Liaise with your supplier for pack weights and any insulation/roofing accessories to roll.

The goal: make the crane‑up as efficient as possible.

 

Risk Assessment

Complete risk‑assessment documentation.

Hold a toolbox meeting the morning of the crane‑up.

Ensure site personnel understand exclusion zone, manual‑handling risks, height hazards.

 

On-Site Compliance

Clip and sign‑off the safety wire before any roof rolling starts.

Super­visor or builder must inspect and approve the system per Australian standards.

 

Crane Location & Setup

Pre‑approve crane location with the builder.

Position truck & crane ideally at the gable end of the building for best access.

For large warehouse roofs, stage so the crane is always ahead of the area being built.


Extension Zone & Landing Platform

Once the truck releases straps and packs are free, mark an exclusion zone around the lift area.

Create a landing platform:

  • First pack on the edge of the building.
  • Second pack ~2‑3 m within rollout area.
  • Then lift insulation into place on top of the second pack.

This ensures the wire is tight and insulation doesn’t damage the setup.

 

Roll-out Using Roof Rollers

  • Before the third pack (the roll): check the Roller system is fully functional and lock the brake.
  • When the pack is landed on Roof Rollers and unhooked from crane, roofing trades begin the roll.
  • Accessories, insulation, roof‑raises, ash‑grid – everything loads directly onto the pack being rolled.

Roof Rollers Australia | On-Site Setup Guide

Your one-page checklist for fater crane-ups, safer worksite, and smoother rollouts.

 Pre-Planning Made Simple

Includes truck plans, pack layouts, and safety prep - everything to get started right away

 Step-by-Srep Crane-Up Process

Follow a proven workdlow to stage your packs, manage lifts, and maintain site efficiency

 Built for Compliance & Safety

Covers AUSMESH sign-off, exlcusion zones, and toolbox talks to meet Aussie safety standards

Shop Roof Rollers

Shop our patented Roof Roller system — Get pricing, check availability, and calculate your site savings with Roof Rollers today

Shop now​​​​

Engineered for Precision

Discover the engineering behind our patented design — built for strength, efficiency, and site safety.

our technology

Need Help With Your Setup?

Our industry experts are here to assist with planning, safety requirements, and choosing the right Roof Roller package for your site.